Our transition toward cleaner manufacturing begins with the energy behind every operation.

At Banaskantha, Gujarat, our 8 MW captive solar plant generates approximately
9 million units of clean electricity every year—meeting nearly half of our
annual energy requirement through renewable power.

Banaskantha 8.0 MW Captive Solar Array
THE ENERGY SHIFT

HALF OUR ENERGY.
FROM THE SUN.

Our manufacturing operations require approximately 18 million units of electricity annually.

Our captive solar plant is designed to generate approximately 9 million units of clean electricity each year—bringing renewable energy to nearly 50% of our total requirement.

TOTAL ANNUAL
ENERGY REQUIREMENT

18M

UNITS

50%
FROM SOLAR (9M UNITS)
50%

OF ANNUAL ENERGY
REQUIREMENT

Banaskantha 8 MW Captive Solar Field Array
THE PROJECT

ONE FIELD.
MILLIONS OF UNITS.

Located in Banaskantha, Gujarat, the 8 MW captive solar plant is a direct investment in cleaner energy for our manufacturing operations.

Commissioned during December 2025–January 2026, the project represents an investment of approximately ₹26–28 crore.

8MW

CAPTIVE SOLAR

BANASKANTHA / GUJARAT
COMMISSIONED 2025–26
₹26–28 CR INVESTMENT
MEASURABLE IMPACT

7,380 TONNES.
AVOIDED EVERY YEAR.

The renewable energy initiative is expected to avoid approximately 7,380 tonnes of CO₂ emissions annually, reducing the environmental footprint associated with our electricity consumption.

7,3807,380
TONNES OF CO₂ / YEAR
MEASURED ANNUALLY
RENEWABLE ENERGY CONTRIBUTION
ENVIRONMENTAL FOOTPRINT
OUR APPROACH

SUSTAINABILITY IS
NOT A SIDE PROJECT.

Our renewable energy investment forms part of a broader approach to responsible steel manufacturing—bringing energy efficiency, renewable power and environmental responsibility closer to the way we operate.

01_

RESOURCE EFFICIENCY

Optimizing thermal and energy consumption across electric induction furnaces to minimize waste per ton of steel.

02_

RENEWABLE POWER

Wheeling 9 million units of clean solar electricity annually from our 8.0 MW captive plant to power operations.

03_

CIRCULAR ECOSYSTEM

Recycling 100% steel scrap charges and slag by-products into sustainable industrial applications.

THE PLANT.
IN REALITY.

A glimpse of our 8 MW captive solar plant in Banaskantha, Gujarat — generating clean energy and contributing to a more sustainable future.

Sunset over Banaskantha Solar Field
High Efficiency PV Modules
Main Solar Field Array
Substation & Control Building
Grid Power Transmission Connection

GET IN TOUCH WITH US

Have custom steel specifications or technical inquiries? Connect with our team today.